May 14, 2020
Semi Conductor Facilities, Seremban
Freezer Room
Background
DRAS has been approached by a main contractor to supply a Freezer Room for a semi conductor supplier in Seremban, Malaysia.
Process
As part of the end user’s on-going facility upgrade works, the end user required a new freezer room within the existing factory.
Solution
DRAS’s engineers and in-house installation team constructed the freezer room using DRAS-PIR panel, Bitzer Compressor, Guntner Evaporator, and Automatic sliding door.
| Location | Seremban, Malaysia |
| Building Use | Semi Conductor |
| Room Temperature | -20oC |
| Panel Core | DRAS-PIR (Polyisocyanurate) |
| Panel Thickness | 125mm |
| Compressor | Bitzer |
| Evaporator | Guntner |
| Services | – Full Site Survey – Design Consultation – PIR Panel Installation – Condensing System Installation |